Shenzhen Capital Plaza was launched in 2013 and completed in 2022. The total construction area of the project is 167640 square meters and the building height is 262 meters. It is located in the core area of Houhai, Shenzhen, and stands next to the China Resources Headquarters. The project base has three characteristics. First of all, the project backs to the office and business district and faces Shenzhen Bay. Second, subway lines, streets, and two-story pedestrian systems across the base. Third, it is a link that integrates many elements. The location, scale, and transportation resources of the project determine that it is a "hub park" integrating commercial, hub, coastal activities, and other elements. The podium connects the surrounding, and the swirling open volume integrates the subway, Elements such as commerce, pedestrian system, waterfront activities, and roof gardens are combined to become a "Central Park".
The design uses a unique folded skin form to embody the coastal architecture (wave) and financial tower (diamond), giving the public an image of stability, lightness, and elegance. By studying the shape, we get a facade control line, and based on this line, we find a triangular basic unit, which can be combined into the shape of a diamond, and form a folded skin through three-dimensional processing. The tower follows the principle of high efficiency and practicality and adopts integrated innovative design on the combination of structure and space. At the same time, the project pays full attention to people's feelings and experiences and is moderately open to the city.